Analysis of flow valve installation

① After the arrival of the goods should be properly stored, to avoid rain, stored in a dry place; ② should be installed according to the direction of the water flow arrow shown by the valve body, do not install the anti; ③ In the pipe can be mounted vertically or horizontally; ④ flow settings Set method: With a special wrench, open the protective screw, rotate the stem, so that the scale line to set the corresponding value of the flow; ⑤ flow valve does not have off function, according to need, should be set off the valve. More Keyword Search: Flow Valve

Excavator Components

This classification mainly includes the aluminum die casting Machinery Parts using in Excavator Components area.
From the part, we can easily find that the parts have a lot of features of big cavities, so the part will have big potential risk of mold release problem, if so, the part may happen to be deform, sticking to the mold etc, especially when the part sticking to the mold, if no clear in time, while next shot, the mold may be destroyed while clamping.
Normal raw material: ADC12,A380,YL102
Process Technology: Low-pressure casting,Shot Blasting,NC Machining,Spray Coating
Product Dimensions: Customized
Casting General Tolerance: Grade GBT6414-CT8
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Machinery Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Die Casting Excavator Parts,Die Casting Excavator Components,Al Die Casting Excavator Components

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com